AI data center infrastructure on sites with existing power assets

Matapas Infrastructure develops AI and HPC capacity where power, interconnection, and cooling already exist — so projects reach energization in months, not years.

Thesis

Compute demand moved faster than the grid.

New data centers wait years for interconnection. AI demand is compounding while utility queues, transmission studies, and substation builds stretch project timelines past the planning horizon of the compute itself.

Energized capacity is hiding in plain sight. Grid-connected industrial sites hold power contracts, substations, fiber, and cooling built for dense compute — and utility-scale renewables in congested markets curtail energy that never reaches the grid at all.

We develop across both. Matapas Infrastructure sits between the power asset and the compute demand, and structures the deal that connects them.

Greenfield interconnection, major US markets 4–7 yrs
New substation & transmission build 2–4 yrs
Developing on an energized site < 12 mo
Indicative development timelines
Sites

Where we develop.

Grid-connected · US wholesale markets

Energized industrial sites

Grid-connected facilities with transferable utility power contracts, existing substations, cooling, and fiber — repositioned for AI/HPC use.

  • Utility power agreements at competitive industrial rates
  • Development-ready in months, not years
Behind-the-meter · Curtailed generation

Curtailed renewables + storage

Utility-scale solar in congested markets routinely curtails energy that never reaches the grid. We co-develop compute and storage behind the meter — turning stranded generation into revenue for the asset owner and low-cost power for the load.

  • Flexible load shaped to the curtailment profile
  • Co-located storage to firm intermittent supply

We develop each project from origination through structuring — securing the site, assembling the partnership, and staying invested through delivery.

Originate → Secure → Structure → Deliver
Named for Kapetan Matapas of the Mani — and for Cape Matapan, the southernmost point of mainland Greece. A hard coast, and a fixed point to navigate by.
Matapas Infrastructure · A Matapas Corp. company
Contact

Have a site with power?

We move quickly on sites with existing power assets. Reach out with a one-line diagram, a utility contract summary, or just an address — we'll take it from there.